通过 迈克尔·杰根马克·坎皮比亚诺

2014年10月16日,联邦能源管理委员会(“FERC”) issued an Order on Tariff Revisions, 联邦能源管理委员会 Docket No. ER14-2574,有条件地接受加利福尼亚州独立系统运营商(“CAISO”)建立新的灵活资源充足能力(“FRAC”)和必须提供的义务(“MOO”) requirements intended to ensure that adequate flexible capacity is available to address the added variability 和 net load volatility associated with ongoing 和 expected future changes on the 凯索-controlled grid.  The FRAC-MOO requirements will be effective, subject to a compliance 备案 by the 凯索 (due within 30 days of the date of the order), effective November 1, 2014, to allow load serving entities (“LSEs”) subject to the requirements time to make their first FRAC showings to the 凯索 by November 15, 2014.

详见 先前的《清洁能源法》报告, the 凯索 proposed its FRAC-MOO requirements to help meet the expected increased need for flexible capacity resources that can ramp up 和 down quickly 和 start 和 shut down potentially multiple times per day to address what the 凯索 described as a “重大转变” taking place on the 凯索-controlled grid in terms of increasing deployment of renewable energy-based variable energy resources, including the possible deployment of 12,000 megawatts of distributed generation resources being contemplated under state policies. In its 备案, the 凯索 relied on studies showing (as illustrated in the 凯索’s well-known “duck chart” (as excerpted from 备案)) the heightened level of uncertainty 和 variability of operating conditions on the 凯索-controlled grid.

如先前的《清洁能源法》报告中所述,CAISO’FRAC-MOO提案包含七个基本要素,这些要素是与加利福尼亚公共事业委员会和加利福尼亚州其他地方监管机构的资源充足机制共同设计的,力求提供一种机制,以确保希望成为FRAC资源的灵活能力资源能够提交进入由CAISO管理的能源和辅助服务市场的经济竞标。这些要素是:(1)需求确定; (2)三种灵活的能力类别; (3)将三个灵活能力类别中的每个类别的需求分配给地方监管机构; (4)FRAC提前一个月和一年一个显示; (5)CAISO’对那些FRAC表现的评估; (6)与每个弹性容量类别相关的MOO;和(7)CAISO’s支持灵活的能力采购授权。

联邦能源管理委员会 conditionally accepted this proposal with only two substantive modifications. First, the 凯索 will remove the part of its proposed FRAC-MOO requirements that would calculate an effective flexible capacity value only for those resources that submitted an economic bid for energy in the prior year. Second, the 凯索 will include a limited exception from a O for use-limited resources, such as hydroelectric generation resources. 联邦能源管理委员会 also directed the 凯索 to make a compliance 备案 (as discussed above), 和 an informational report 备案, 12 months after the FRAC-MOO is implemented.